![]() |
How do I change the order? I used to have my Library go in an order so I could see which songs I had downloaded last and which one was the first I downloaded, etc. But then my friend thought it would be funny to change it and make it alphabetical, but it annoys me so I would like to know how to change that Thank you in advance:licklips: |
In LW's library, right click on the column header & tick 'last modified'. Now you'll see a 'last modified' column in the library & you can click on that to show the most recent downloads first. |
Quote:
|
All times are GMT -7. The time now is 04:49 AM. |
Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2025, vBulletin Solutions, Inc.
SEO by vBSEO 3.6.0 ©2011, Crawlability, Inc.
Copyright © 2020 Gnutella Forums.
All Rights Reserved.