![]() |
|
Register | FAQ | The Twelve Commandments | Members List | Calendar | Arcade | Find the Best VPN | Today's Posts | Search |
Getting Started Using LimeWire + WireShare Tips on getting started with LimeWire or WireShare. Also a place to seek help getting started. Includes the original LimeWire Pirate Edition thread, with the most up to date LPE installer packages on the internet including File_Girl's LPE version, and WireShare the most upgraded version of them all. |
| LinkBack ![]() | Thread Tools ![]() | Display Modes ![]() |
|
| |||
![]() I used to have my Library go in an order so I could see which songs I had downloaded last and which one was the first I downloaded, etc. But then my friend thought it would be funny to change it and make it alphabetical, but it annoys me so I would like to know how to change that Thank you in advance ![]() |
| |